road work from fraser to knight on king edward just a heads up there is road work from fraser to knight on king edward. most of the pavement is gone except the manholes are still raised so be careful with lowered cars (esp in the rain where vision is limited)! and watch out for the bump at the end! |
they've been working on that stretch of road for a long time now...... |
Been almost a year already. This is still alot better than before. LOL. |
They tore up Knight to Main since like September. But yeah, avoiding the manholes are good. I know what you're talking about re: the bump at the end. :lol |
All times are GMT -8. The time now is 12:16 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO ©2011, Crawlability, Inc.
Revscene.net cannot be held accountable for the actions of its members nor does the opinions of the members represent that of Revscene.net