REVscene - Vancouver Automotive Forum


Welcome to the REVscene Automotive Forum forums.

Registration is Free!You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today! The banners on the left side and below do not show for registered users!

If you have any problems with the registration process or your account login, please contact contact us.


Go Back   REVscene Automotive Forum > Automotive Chat > Vancouver Off-Topic / Current Events

Vancouver Off-Topic / Current Events The off-topic forum for Vancouver, funnies, non-auto centered discussions, WORK SAFE. While the rules are more relaxed here, there are still rules. Please refer to sticky thread in this forum.

Reply
 
Thread Tools
Old 01-02-2024, 01:13 PM   #76
I WANT MY 10 YEARS BACK FROM RS.net!
 
twitchyzero's Avatar
 
Join Date: Oct 2007
Location: Vancouver BC
Posts: 22,120
Thanked 9,906 Times in 3,932 Posts
Failed 881 Times in 421 Posts
do steel studs hold up better or worse in earthquake?
Advertisement
twitchyzero is offline   Reply With Quote
Old 01-02-2024, 01:28 PM   #77
I answer every Emotion with an emoticon
 
6793026's Avatar
 
Join Date: Apr 2004
Location: BC, HK, USA
Posts: 7,780
Thanked 2,607 Times in 1,111 Posts
Failed 167 Times in 74 Posts
I'm doing a build now and lesson I've learned.

1) you get what you pay for. If the engineer is good, he/she will discuss material being used as well as how cabinets, doors and trims being done.

2) Office + bedroom wiring. having a plug at desk height + kitchen island and bedside table as well as vaccum was really good on our end to ensure we map out where we put out stuff

3) Your GC doesn't care. They care about efficiency and quality of work. It's your money. Don't always trust their quote.

4) Always have a backup of a backup and a backup budget... cause we of course went overbudget as my wife has "standards" LOL.
i just need a bed and a kitchen and a garage. who cares if anything matches. LOL
6793026 is online now   Reply With Quote
This post thanked by:
Old 01-02-2024, 02:07 PM   #78
To me, there is the Internet and there is RS
 
Manic!'s Avatar
 
Join Date: Apr 2004
Location: Nanaimo
Posts: 16,911
Thanked 8,024 Times in 3,758 Posts
Failed 1,511 Times in 649 Posts
Quote:
Originally Posted by jcmaz View Post
If I were designing a custom home, I'd pipe all of my LV runs in PVC to a central data/server room. I'd also add additional pipe runs for speaker wiring and HDMI wiring as well. I would aim for two 200A panels (for in-floor heating, multiple EV chargers, and rental suit) and subpanels in each "zone" of the house for future additions.

I would add valved/zone ducting HVAC for gas furnace and electric AC unit for optimal temperature control. All the thermostats would be piped as well I want gas stoves, and gas outlets for outdoor BBQ and fires.

I don't know how it would be built, but I would want to use concrete for the entire house. Metal studs would be offset for maximum sound proofing with proper insulation. Double drywall would be used.
Run a rope in the pipe so you can pull a cable later on. Use smurf tube instead of pvc pipe so yo don't have sharp bends. https://carlonsales.com/flexplusblueent.php

Using concrete is going to cost way more like 2x the price of a wood frame.
__________________
Until the lions have their own historians, the history of the hunt will always glorify the hunter.
Manic! is online now   Reply With Quote
Old 01-02-2024, 02:18 PM   #79
I have named my kids VIC and VLS
 
Hondaracer's Avatar
 
Join Date: Oct 2001
Posts: 38,738
Thanked 15,645 Times in 6,322 Posts
Failed 2,133 Times in 727 Posts
Running conduit of any sort from a central hub to each individual outlet is pretty much a pipe dream, pardon the pun.

Even flexible tubing etc. you’re not gonna be using a hole saw 300 times to cut your floor joists etc. so you can run conduit. The better idea is to use junctions and have 1-2 backup runs in each box.

I’m not even sure you could pull a new Ethernet run through a 50 foot 2” conduit that had 2-3 90’s. It would be VERY stiff
__________________
Dank memes cant melt steel beams
Hondaracer is online now   Reply With Quote
Old 01-02-2024, 09:36 PM   #80
To me, there is the Internet and there is RS
 
Manic!'s Avatar
 
Join Date: Apr 2004
Location: Nanaimo
Posts: 16,911
Thanked 8,024 Times in 3,758 Posts
Failed 1,511 Times in 649 Posts
I would not run smurf tube for speaker wire or Ethernet because speaker wire has never changed and cat6e will be good for 25 years plus but I would run it for HDMI. The HDMI spec has changed multiple times in the last 10 years.
__________________
Until the lions have their own historians, the history of the hunt will always glorify the hunter.
Manic! is online now   Reply With Quote
Old 01-02-2024, 10:11 PM   #81
Rs has made me the man i am today!
 
SSM_DC5's Avatar
 
Join Date: Sep 2004
Location: Canada
Posts: 3,036
Thanked 1,381 Times in 578 Posts
Failed 28 Times in 12 Posts
Quote:
Originally Posted by 6793026 View Post
I'm doing a build now and lesson I've learned.

1) you get what you pay for. If the engineer is good, he/she will discuss material being used as well as how cabinets, doors and trims being done.

2) Office + bedroom wiring. having a plug at desk height + kitchen island and bedside table as well as vaccum was really good on our end to ensure we map out where we put out stuff

3) Your GC doesn't care. They care about efficiency and quality of work. It's your money. Don't always trust their quote.

4) Always have a backup of a backup and a backup budget... cause we of course went overbudget as my wife has "standards" LOL.
i just need a bed and a kitchen and a garage. who cares if anything matches. LOL
Your engineer cares about the trims + cabinet materials? I would have imagined that up to the GC and the sub they hire, but I haven't come across any GC that will go that details to tell you ahead of time what the materials will be during the estimate stage. Bid low, win the job and tell the customer later that they quoted for the bottom of the barrel material and the actual material you want is a surcharge.

Quote:
Originally Posted by Hondaracer View Post
Running conduit of any sort from a central hub to each individual outlet is pretty much a pipe dream, pardon the pun.

Even flexible tubing etc. you’re not gonna be using a hole saw 300 times to cut your floor joists etc. so you can run conduit. The better idea is to use junctions and have 1-2 backup runs in each box.

I’m not even sure you could pull a new Ethernet run through a 50 foot 2” conduit that had 2-3 90’s. It would be VERY stiff
What if he built a chute of some sort at the corner of the house or within the fireplace area that reaches roof to basement, then in between each floor do a drop ceiling and run everything through that? turning your joists into swiss cheese to run extra conduit and wiring may not be the greatest idea if you take structural integrity and labour hours into consideration. Using a milwaukee holehawg is pretty sweet, but not when the worker needs to keep climbing up and down ladders to accommodate people's desire for 12 foot ceilings everywhere. With central AC and requirements for large ducting, are drop ceilings more common than cutting joists now?
SSM_DC5 is offline   Reply With Quote
Old 01-03-2024, 05:58 AM   #82
I have named my kids VIC and VLS
 
Hondaracer's Avatar
 
Join Date: Oct 2001
Posts: 38,738
Thanked 15,645 Times in 6,322 Posts
Failed 2,133 Times in 727 Posts
Very few new builds seem to use a drop ceiling g anymore but yea, that obviously adds a lot of flexibility. What you’re talking about is what I did, I actually used our old chimney to pull a bunch of runs up through from basement to attic.

A great trick I learned for pulling new cables etc. is using the old cable as the pull through, so like hdmi etc. cut the ends off the old hdmi, tape the new hdmi to the end of the old one, and use the old one to pull the new one through, also might as well tape a new pull string to the new HDMI while you’re at it
__________________
Dank memes cant melt steel beams
Hondaracer is online now   Reply With Quote
Old 01-05-2024, 02:50 PM   #83
I *heart* Revscene.net very Muchie
 
Join Date: Nov 2004
Location: vancouver
Posts: 3,734
Thanked 792 Times in 394 Posts
Failed 152 Times in 50 Posts
hot and cold water to exterior hose bibs, or at least one with a mixing valve in the garage
blkgsr is offline   Reply With Quote
Old 01-05-2024, 07:20 PM   #84
RS has made me the bitter person i am today!
 
Hehe's Avatar
 
Join Date: Dec 2002
Location: YVR/TPE
Posts: 4,886
Thanked 2,972 Times in 1,284 Posts
Failed 652 Times in 209 Posts
I have been working on a design plan to re-build/major reno my place.

Here is the few things that I would recommend:

1. If you are going custom, the idea is to get everything *you* want. Don't worry too much about resale down the road. Assuming you are going to stay in there for a few decades, whatever crazy plan you come up with would affect little in term of resale value in the long term.

2. Plan ahead. Think not just about the things you want/need. But also what's going to be in the future. Wiring for Ethernet, for example, just get the Cat6. The cost difference is marginal in the grand scheme of things. And go as far as you can afford in term of everything from faucet/pipes to plugs. It's a lot cheaper to do things when you have everything wide open. One of the custom-built a buddy worked on gave me a lot of inspiration. The owner wired the crap out of the place and left panels where he'd have easy access for things like in-wall HDMI cable and whatnot. Done properly (as in design stage), it should not cost a whole lot more other than cost of panels or whatever cosmetic to hide those things out of sight. One of the very clever thing he did also was to mark everything where they are in a PDF before the drywall were put on. He went as far as all the studs. So much so that as long as he's got a tape measure in hand, he doesn't even need a stud-finder.

3. If there's any preference, find an appropriate contractor. Say if you want a concrete/steel beam build, talk to contractors/designers who has experience with them to price properly. Very often we hear that x is more expensive than y... it's really because they can't find the proper people to do them. In the house mentioned above, he's got a few steel beams to hold the structure on all 3 floors. And because those beams can hold so much more weight, the final price actually wasn't all that much different.

4. Coming back to the "plan ahead" thing... some stuff might be cheaper at first, but since it's going to be a complete new-build, there are many things that make more sense to just put in from the get-go. Things like passive housing. You don't need to go all out to meet enough to have it certified as such since that's $$$, but just some elements, like a very high insulation can start payback very early given it's a new build. Also someone already mentioned... get more than enough on things like power. 2x200amp service is not a whole lot more than 1x200amp service if you are doing new build. But the possibility that such a decision opens up down the road can be priceless.

One of my neighbors built an enormous house (12000sqft) a few house down from us, and the one thing that he regrets was to cheap out on his insulation and HVAC. It costs less for him on paper... but now it costs him over $2500 a month to heat the place and it's not all that comfortable. Sure he could afford paying $2k+ a month on heating bills, but compared to his in-law's place, who was built with high insulation and a geothermal system... pays less than half for heating/cooling for a similar size home out in Chilliwack, which tends to be colder/hotter than us and it's actually comfortable throughout the house.
__________________
Nothing for now
Hehe is offline   Reply With Quote
This post thanked by:
Old 01-06-2024, 08:21 AM   #85
I have named my kids VIC and VLS
 
Hondaracer's Avatar
 
Join Date: Oct 2001
Posts: 38,738
Thanked 15,645 Times in 6,322 Posts
Failed 2,133 Times in 727 Posts
“Finding the appropriate contractor” is easier said than done

High end builders aren’t going to build a sub 10 million dollar home unless you’re best friends with the builder. They don’t want the headache or hassle of dealing with small time clients who nickel and dime everything. Hence the reason why almost every build now is buddy guy or Chinese builders.
__________________
Dank memes cant melt steel beams
Hondaracer is online now   Reply With Quote
Old 01-06-2024, 08:25 AM   #86
in the butt
 
donk.'s Avatar
 
Join Date: Aug 2016
Posts: 3,009
Thanked 3,895 Times in 1,400 Posts
Failed 193 Times in 105 Posts
I can picture it now:

RabidRat to his GC: "So i was talking to some guys on a car forum about my house build and i think that........"
GC "oh fuck not another one"
__________________
Quote:
Originally Posted by Mr.Money
i hate people who sound like they smoke meth then pretend like they matter.

Originally Posted by ilovebacon
Does anyone have a pair of 25 pounds one-inch hole for sale at a reasonable price?


Originally Posted by BIC_BAWS
pretty clean looking car tho... Kinda gay

donk. is offline   Reply With Quote
This post thanked by:
Old 01-06-2024, 09:15 AM   #87
RS has made me the bitter person i am today!
 
Hehe's Avatar
 
Join Date: Dec 2002
Location: YVR/TPE
Posts: 4,886
Thanked 2,972 Times in 1,284 Posts
Failed 652 Times in 209 Posts
Quote:
Originally Posted by donk. View Post
I can picture it now:

RabidRat to his GC: "So i was talking to some guys on a car forum about my house build and i think that........"
GC "oh fuck not another one"
That's exactly the thing... most builders are doing what they are comfortable with.

If a builder has done wood framing all his life, he's not going to price a steel/concrete build appropriately. He either won't do it or price it into the stratosphere because he's just going to go with a high figure and make sure he can get it done while making money and just sub-out whatever the work is.

The idea is that, if you are building a steel/concrete home, find a builder that had a lot of experience building those specific type of house.

Same thing goes for things like HVAC. My dad recently installed a geothermal system at his place. When I started doing quotes for him... prices were all over. They were as high as 100k and starts at 80k using a mediocre system.

I then found a HVAC guy who had been doing geothermal pretty much exclusively. He priced out everything using the best hardware available in Canada for every piece of equipment in the equation... from the geothermal heat pump itself to the fan coil that retrofits the system. 100% state of the art. Going as far as replacing our pool heater using the same system and a new DHW... all for less than any quote that I had before.
__________________
Nothing for now

Last edited by Hehe; 01-06-2024 at 09:21 AM.
Hehe is offline   Reply With Quote
This post thanked by:
Old 01-06-2024, 09:55 AM   #88
SFICC-03*
 
Join Date: Mar 2002
Location: richmond
Posts: 8,752
Thanked 3,357 Times in 1,316 Posts
Failed 162 Times in 84 Posts
from my experience you really have to be involved with so many small details or else don't expect it to turn out your way. you can trust the gc all you want but even if he's a good one, he will do things the proper way but not necessarily the way you want them to be done. the moment you go autopilot on the construction, especially with the stuff you see like finishings, is when things get done differently than the way you want. when you ask them to change it then you have to pay for those changes.
unit is online now   Reply With Quote
This post thanked by:
Old 01-06-2024, 10:32 PM   #89
To me, there is the Internet and there is RS
 
underscore's Avatar
 
Join Date: Apr 2007
Location: Okanagan
Posts: 17,132
Thanked 9,900 Times in 4,312 Posts
Failed 433 Times in 231 Posts
You have to watch them even on bigger stuff. When my parents had a place built they built the staircase completely the wrong way around. They were checking on it a lot because they were able to, so it was still just framing when they pointed it out, but if they weren't able to be doing that it would've been a big pain.
__________________
1991 Toyota Celica GTFour RC // 2007 Toyota Rav4 V6 // 2000 Jeep Grand Cherokee
1992 Toyota Celica GT-S ["sold"] \\ 2007 Jeep Grand Cherokee CRD [sold] \\ 2000 Jeep Cherokee [sold] \\ 1997 Honda Prelude [sold] \\ 1992 Jeep YJ [sold/crashed] \\ 1987 Mazda RX-7 [sold] \\ 1987 Toyota Celica GT-S [crushed]
Quote:
Originally Posted by maksimizer View Post
half those dudes are hotter than ,my GF.
Quote:
Originally Posted by RevYouUp View Post
reading this thread is like waiting for goku to charge up a spirit bomb in dragon ball z
Quote:
Originally Posted by Good_KarMa View Post
OH thank god. I thought u had sex with my wife. :cry:
underscore is offline   Reply With Quote
This post thanked by:
Old 01-08-2024, 04:02 AM   #90
I answer every Emotion with an emoticon
 
6793026's Avatar
 
Join Date: Apr 2004
Location: BC, HK, USA
Posts: 7,780
Thanked 2,607 Times in 1,111 Posts
Failed 167 Times in 74 Posts
^ at least your parents knew what's right and whats wrong. cause a normal perosn won't know at all.
6793026 is online now   Reply With Quote
Old 01-16-2024, 05:22 PM   #91
RS.net, helping ugly ppl have sex since 2001
 
TypeRNammer's Avatar
 
Join Date: Jan 2005
Location: Vancouver
Posts: 9,594
Thanked 3,620 Times in 1,228 Posts
Failed 236 Times in 60 Posts
Quote:
Originally Posted by unit View Post
from my experience you really have to be involved with so many small details or else don't expect it to turn out your way. you can trust the gc all you want but even if he's a good one, he will do things the proper way but not necessarily the way you want them to be done. the moment you go autopilot on the construction, especially with the stuff you see like finishings, is when things get done differently than the way you want. when you ask them to change it then you have to pay for those changes.
Also another good thing to note is make sure the home is nicely sealed and tight.

Being in my laneway for my first winter, my main door and bi folding patio door has a cold draft blowing into the home

And another cold draft is coming through the dish washer and bottom corner cabinetry

Upstairs sliding balcony doors had drafts coming in too but they've been fixed.

Definitely gonna give the GC an earful to rectify the situation.
__________________
Quote:
Originally Posted by The_AK View Post
Or you meet some girl at the club, cum inside of her, find out shes only in grade 12, so you buy a Prada bag for her to make things right, she finds out the bag is a fake and decides to have the kid
Quote:
Originally Posted by RX_Renesis View Post
wtf did she get some bolt-on titties or what?
they look sooooooooooo much bigger than they were 2ish years ago.
Quote:
Originally Posted by nns View Post
I can't stand the sound of Mandarin either. Boo yow nee bey nee shing bo now noong gey shee mayo mayo mayo mayo mayo mayo mayo.
TypeRNammer is offline   Reply With Quote
This post thanked by:
Old 01-16-2024, 07:25 PM   #92
Rs has made me the man i am today!
 
SSM_DC5's Avatar
 
Join Date: Sep 2004
Location: Canada
Posts: 3,036
Thanked 1,381 Times in 578 Posts
Failed 28 Times in 12 Posts
No blow test was required for the build?
SSM_DC5 is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off



All times are GMT -8. The time now is 11:11 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
SEO by vBSEO ©2011, Crawlability, Inc.
Revscene.net cannot be held accountable for the actions of its members nor does the opinions of the members represent that of Revscene.net