![]() |
Quote:
|
Newsflash: #3 between Hope and Princeton is getting repaved right now with big chunks already done. There's still construction crews in a couple spots where it turns into a single lane in alternating direction but otherwise the highway is much, much smoother. Get a hold of it before winter sets in. |
All times are GMT -8. The time now is 07:06 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
SEO by vBSEO ©2011, Crawlability, Inc.
Revscene.net cannot be held accountable for the actions of its members nor does the opinions of the members represent that of Revscene.net